Vol. 11 No. 2 (2019): Agustus

					View Vol. 11 No. 2 (2019): Agustus
Published: 2019-08-07

Articles

  • ANALISIS JARINGAN DAN PEMELIHARAAN PADA JARINGAN DISTRIBUSI DI PT.PLN WILAYAH CABANG PINRANG

    Rizal Duyo, Andi Sulkifli
    1-11
    DOI: https://doi.org/10.26618/jte.v1i2.2379
  • STUDI TRANSFORMATOR PADA GARDU INDUK PANAKKUKANG PERUSAHAAN LISTRIK NEGARA WILAYAH III

    Abdul Hafid, Debiana Debiana
    12-18
    DOI: https://doi.org/10.26618/jte.v1i2.2380
  • MODEL PEMBANGKIT LISTRIK TENAGA OMBAK

    Andi Faharuddin, Andika Saputra, Satriani Satriani
    19-27
    DOI: https://doi.org/10.26618/jte.v1i2.2381
  • PERANCANGAN ALAT SISTEM PENGONTROLAN SUHU DAN KELEMBAPAN RUANG BUDIDAYA ULAT SUTERA BERBASIS WIRELESS

    Umar Katu, Rosmilawaty Rosmilawaty, Anri Iswanto
    28-39
    DOI: https://doi.org/10.26618/jte.v1i2.2382
  • ANALISIS TEKNOLOGI PEMBANGKIT LISTRIK BIOMASSA PADA SISTEM PENCAHAYAAN PETERNAKAN AYAM DI DESA BORIMATANGKASA KEC. BAJENG BARAT

    Adriani Adriani
    40-51
    DOI: https://doi.org/10.26618/jte.v1i2.2383
  • ANALISIS POWER BUDGET JARINGAN KOMUNIKASI SERAT OPTIK DI PT.TELKOM AKSES MAKASSAR

    Rahmania Rahmania
    52-64
    DOI: https://doi.org/10.26618/jte.v1i2.2400