Abstract

Competitive tendering requires contractors to select a bid markup that balances the probability of winning against the expected profit. Although the Gates and Friedman bidding models have been widely applied, empirical comparisons of their performance across alternative probability distributions remain limited, particularly in Indonesian construction tendering. This study compares the performance of the Gates and Friedman models using historical tender data associated with the Rehabilitation of the Krueng Aceh Weir Project in Indonesia. Both models were evaluated under three probability distributions: multiple discrete, multivariate normal, and univariate normal. For each model-distribution combination, the probability of winning, expected profit, and optimum markup were calculated. Differences in the resulting markup values between the two bidding models were subsequently examined using one-way analysis of variance. The results show that, within the analyzed tender dataset, the Gates model produced optimum markups ranging from 6% to 8%, whereas the Friedman model produced higher optimum markups ranging from 8% to 10%. The Gates model generally generated higher winning probabilities at lower markup levels, while the Friedman model generated higher expected profits at higher markup levels. These findings demonstrate that model selection and probability-distribution assumptions materially affect the recommended bidding strategy. The study provides empirical evidence to help contractors select bidding models consistent with their profit objectives and tolerance for a lower probability of winning.

 

 

References

[1] F. Ghodoosi, A. Bagchi, M. R. Hosseini, T. Vilutiene, and M. Zeynalian, “Enhancement of bid decision-making in construction projects: A reliability analysis approach,” J. Civ. Eng. Manag., vol. 27, no. 3, pp. 149–161, 2021.

[2] F. Hidayat, H. M. Ramdhan, and M. S. P. Jayadi, “Analisis perbandingan model Gates, Ackoff & Sasieni, dan Friedman dalam simulasi strategi penawaran tender proyek peningkatan jalan di Kota Bandung,” J. Sustain. Constr., vol. 1, no. 1, pp. 35–44, 2021.

[3] T. Hanak, A. Drozdova, and I. Marović, “Bidding strategy in construction public procurement: A contractor’s perspective,” Buildings, vol. 11, no. 2, Art. no. 47, 2021.

[4] A. Faraji, M. Rashidi, N. A. Eftekhari, S. Perera, and S. Mani, “A bid/mark-up decision support model in contractor’s tender strategy development phase based on project complexity measurement in the downstream sector of petroleum industry,” J. Open Innov.: Technol. Mark. Complex., vol. 8, no. 1, Art. no. 33, 2022.

[5] H. Z. Azlan, S. S. Khaderi, and A. S. Bakri, “Critical factors influencing bid mark-up decision in public street project—A review,” Built Environ. J., vol. 21, no. 1, pp. 30–44, 2024.

[6] B. L. Oo, H.-P. Lo, and B. T.-H. Lim, “The effect of bidding success in construction bidding,” Eng., Constr. Archit. Manag., vol. 19, no. 1, pp. 25–39, 2012.

[7] A. Leśniak, “Statistical methods in bidding decision support for construction companies,” Appl. Sci., vol. 11, no. 13, Art. no. 5973, 2021.

[8] I. S. Zaqout, M. S. Islam, L. A. Hadidi, and M. Skitmore, “Modeling bidding decisions and bid markup size for construction projects: A fuzzy approach,” Eng. Appl. Artif. Intell., vol. 113, Art. no. 104982, 2022.

[9] J. Serugga, “AI-assisted game theory approaches to bid pricing under uncertainty in construction,” AppliedMath, vol. 5, no. 2, Art. no. 39, 2025.

[10] B. L. Oo, A. T. Nguyen, Y. Ahn, and B. T. H. Lim, “Predicting the number of bidders in construction competitive bidding using explainable machine learning models,” Constr. Innov., vol. 25, no. 7, pp. 158–188, 2025.

[11] C. Meng, X. Duan, and D. Qu, “Formation and evolution mechanisms of bidding competitive advantage in construction enterprises: Insights from the RSC framework,” Ain Shams Eng. J., vol. 17, no. 6, Art. no. 104185, 2026.

[12] I. K. G. Santhyasa, “Kosmologi tata ruang permukiman tradisional: Studi kasus permukiman Hindu di Dusun Jenglong, Wagir, Malang,” Dharmasmrti: J. Ilmu Agama Kebudayaan, vol. 17, no. 2, pp. 1–10, 2017.

[13] W. N. Rosydiana, “Nyadran: Bentuk akulturasi agama dengan budaya Jawa,” HUMANIS: J. Ilmu-Ilmu Sos. Humaniora, pp. 15–23, 2023.

[14] T. O. Ihromi, Pokok-Pokok Antropologi Budaya. Jakarta, Indonesia: Yayasan Obor Indonesia, 1999.

[15] R. Muasmara and N. Ajmain, “Akulturasi Islam dan budaya Nusantara,” Tanjak: J. Educ. Teach., vol. 1, no. 2, pp. 111–125, 2020.

[16] M. Shokri-Ghasabeh and N. Chileshe, “Critical factors influencing the bid/no bid decision in the Australian construction industry,” Constr. Innov., vol. 16, no. 2, pp. 127–157, 2016.

[17] M. A. Azman, “Bidding competitiveness: A comparative analysis of different bid auctions in Malaysia,” J. Eng. Des. Technol., vol. 14, no. 4, pp. 678–698, 2016.

[18] J. K. Kumar and S. V. Raj, “Bid decision model for construction projects—A review,” Mater. Today Proc., vol. 22, pp. 688–690, 2020.

[19] I. Mahamid, “Critical factors influencing the bid/no-bid decision in the Palestinian construction industry,” Eng., Technol. Appl. Sci. Res., vol. 12, no. 1, pp. 8096–8100, 2022.

[20] C. K. Hon, C. Sun, B. Xia, N. L. Jimmieson, K. A. Way, and P. P.-Y. Wu, “Applications of Bayesian approaches in construction management research: A systematic review,” Eng., Constr. Archit. Manag., vol. 29, no. 5, pp. 2153–2182, 2022. Paper 2_ID_ 21685_hafnidar_73-83

[21] A. Köksal and S. Ersoy Maraş, “Bayesian network model for stakeholder management in large scale housing projects: Prediction of project success,” J. Asian Archit. Build. Eng., vol. 25, no. 2, pp. 1406–1423, 2026.

[22] H. Rani, J. Amin, R. Syuhada, M. Mubarak, and M. Shafly Aqsha, “Enhancing supply chain management risk mitigation: A house of risk methodology applied to brick manufacturing in Aceh Besar Regency,” 2024.

[23] W. Rajapakshe, “Critical risk factors influencing the management of disruptions in construction projects: Insights from recent challenges in Sri Lanka,” Soc. Sci. Humanit. Open, vol. 12, Art. no. 101748, 2025.

[24] J. Jeong and C. Kim, “Comparison of machine learning approaches for medium-to-long-term financial distress predictions in the construction industry,” Buildings, vol. 12, no. 10, Art. no. 1759, 2022.

[25] S. O. Abioye, L. O. Oyedele, L. Akanbi, A. Ajayi, J. M. D. Delgado, M. Bilal, O. O. Akinade, and A. Ahmed, “Artificial intelligence in the construction industry: A review of present status, opportunities and future challenges,” J. Build. Eng., vol. 44, Art. no. 103299, 2021.

[26] H. D. Nguyen and L. Macchion, “A comprehensive risk assessment model based on a fuzzy synthetic evaluation approach for green building projects: The case of Vietnam,” Eng., Constr. Archit. Manag., vol. 30, no. 7, pp. 2837–2861, 2023.

[27] H. A. Rani, J. Amin, A. Ayob, and D. Al Rahmatillah, “Risk probability of time and cost on building construction project: A Monte Carlo simulation,” J. Innov. Technol., vol. 3, no. 2, pp. 60–68, 2022.

Downloads

Published

2026-09-27 — Updated on 2026-09-27

How to Cite

Rani, H. A., Septyan, M. R., Ayob, A., & Razi, P. Z. (2026). Comparative Performance of Gates and Friedman Bidding Models under Alternative Probability Distributions in Construction Tendering. Jurnal Linears, 9(2), 73-83. https://doi.org/10.26618/zhw56395